Parameter Detail: ICE-14(run 4)
| start date (GMT) | 2009-01-27 (27) |
|---|---|
| end date (GMT) | 2009-01-27 (27) |
| degree of supercooling | 0.80 |
| crystalization cell temperature [degC] | 3.02 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 03:25:00 |
| control time (nucleation start) | 04:39:40 |
| control time (laten heat release) | 04:41:28 |
| control time (crystalize start) | 04:49:20 |
| control time (melt start) | 04:50:45 |
| control time (melt end) | 04:54:00 |
| control duration (stabilization) | 01:14:40 |
| control duration (nucleation) | 00:01:48 |
| control duration (crystalization) | 00:09:40 |
| control duration (observation) | 00:01:25 |
| control duration (total) | 00:14:20 |
| note |