Parameter Detail: ICE-14(run 9)
| start date (GMT) | 2009-02-17 (48) |
|---|---|
| end date (GMT) | 2009-02-18 (49) |
| degree of supercooling | 0.80 |
| crystalization cell temperature [degC] | 3.02 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -0.7 |
| nucleation cell temperature (post nucleation) [degC] | 0 -> -10 |
| control time (stabilization start) | 20:05:20 |
| control time (nucleation start) | 00:28:03 |
| control time (laten heat release) | 00:28:50 |
| control time (crystalize start) | 00:46:48 |
| control time (melt start) | 00:50:15 |
| control time (melt end) | 00:53:25 |
| control duration (stabilization) | 04:22:43 |
| control duration (nucleation) | 00:00:47 |
| control duration (crystalization) | 00:18:45 |
| control duration (observation) | 00:03:27 |
| control duration (total) | 00:25:22 |
| note |