Parameter Detail: ICE-15(run 2)
| start date (GMT) | 2009-01-23 (23) |
|---|---|
| end date (GMT) | 2009-01-23 (23) |
| degree of supercooling | 0.90 |
| crystalization cell temperature [degC] | 2.92 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.8 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 00:49:22 |
| control time (nucleation start) | 02:04:05 |
| control time (laten heat release) | 02:05:30 |
| control time (crystalize start) | 02:13:22 |
| control time (melt start) | 02:14:27 |
| control time (melt end) | 02:17:35 |
| control duration (stabilization) | 01:14:43 |
| control duration (nucleation) | 00:01:25 |
| control duration (crystalization) | 00:09:17 |
| control duration (observation) | 00:01:05 |
| control duration (total) | 00:13:30 |
| note |