Parameter Detail: ICE-15(run 4)
| start date (GMT) | 2009-01-27 (27) |
|---|---|
| end date (GMT) | 2009-01-27 (27) |
| degree of supercooling | 0.90 |
| crystalization cell temperature [degC] | 2.92 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 05:02:40 |
| control time (nucleation start) | 06:15:22 |
| control time (laten heat release) | 06:17:00 |
| control time (crystalize start) | 06:24:18 |
| control time (melt start) | 06:25:15 |
| control time (melt end) | 06:28:00 |
| control duration (stabilization) | 01:12:42 |
| control duration (nucleation) | 00:01:38 |
| control duration (crystalization) | 00:08:56 |
| control duration (observation) | 00:00:57 |
| control duration (total) | 00:12:38 |
| note |