Parameter Detail: ICE-15(run 6)
| start date (GMT) | 2009-02-12 (43) |
|---|---|
| end date (GMT) | 2009-02-12 (43) |
| degree of supercooling | 0.90 |
| crystalization cell temperature [degC] | 2.92 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -1 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 02:31:57 |
| control time (nucleation start) | 03:52:29 |
| control time (laten heat release) | 03:53:15 |
| control time (crystalize start) | 04:06:25 |
| control time (melt start) | 04:08:05 |
| control time (melt end) | 04:11:20 |
| control duration (stabilization) | 01:20:32 |
| control duration (nucleation) | 00:00:46 |
| control duration (crystalization) | 00:13:56 |
| control duration (observation) | 00:01:40 |
| control duration (total) | 00:18:51 |
| note |