Parameter Detail: ICE-16(run 2)
| start date (GMT) | 2009-01-23 (23) |
|---|---|
| end date (GMT) | 2009-01-23 (23) |
| degree of supercooling | 1.00 |
| crystalization cell temperature [degC] | 2.82 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -4.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 02:40:00 |
| control time (nucleation start) | 04:30:10 |
| control time (laten heat release) | 04:31:15 |
| control time (crystalize start) | 04:39:33 |
| control time (melt start) | 04:40:06 |
| control time (melt end) | 04:43:19 |
| control duration (stabilization) | 01:50:10 |
| control duration (nucleation) | 00:01:05 |
| control duration (crystalization) | 00:09:23 |
| control duration (observation) | 00:00:33 |
| control duration (total) | 00:13:09 |
| note |