Parameter Detail: ICE-16(run 3)
| start date (GMT) | 2009-01-27 (27) |
|---|---|
| end date (GMT) | 2009-01-27 (27) |
| degree of supercooling | 1.00 |
| crystalization cell temperature [degC] | 2.82 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 06:39:00 |
| control time (nucleation start) | 07:25:20 |
| control time (laten heat release) | 07:26:30 |
| control time (crystalize start) | 07:34:40 |
| control time (melt start) | 07:35:30 |
| control time (melt end) | 07:39:00 |
| control duration (stabilization) | 00:46:20 |
| control duration (nucleation) | 00:01:10 |
| control duration (crystalization) | 00:09:20 |
| control duration (observation) | 00:00:50 |
| control duration (total) | 00:13:40 |
| note |