Parameter Detail: ICE-01(run 12)
| start date (GMT) | 2009-01-06 (6) |
|---|---|
| end date (GMT) | 2009-01-06 (6) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -12 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 -> 3.77 -> 3.79 |
| control time (stabilization start) | 01:17:57 |
| control time (nucleation start) | 02:26:16 |
| control time (laten heat release) | 02:38:22 |
| control time (crystalize start) | 02:54:00 |
| control time (melt start) | 04:00:30 |
| control time (melt end) | 04:02:00 |
| control duration (stabilization) | 01:08:19 |
| control duration (nucleation) | 00:12:06 |
| control duration (crystalization) | 00:27:44 |
| control duration (observation) | 01:06:30 |
| control duration (total) | 01:35:44 |
| note |