Parameter Detail: ICE-16(run 4)
| start date (GMT) | 2009-01-27 (27) |
|---|---|
| end date (GMT) | 2009-01-27 (27) |
| degree of supercooling | 1.00 |
| crystalization cell temperature [degC] | 2.82 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.6 |
| nucleation cell temperature (post nucleation) [degC] | 2.82 |
| control time (stabilization start) | 07:45:00 |
| control time (nucleation start) | 08:59:53 |
| control time (laten heat release) | 09:01:25 |
| control time (crystalize start) | |
| control time (melt start) | |
| control time (melt end) | |
| control duration (stabilization) | 01:14:53 |
| control duration (nucleation) | 00:01:32 |
| control duration (crystalization) | |
| control duration (observation) | |
| control duration (total) | |
| note |