Parameter Detail: ICE-19(run 1)
| start date (GMT) | 2009-02-09 (40) |
|---|---|
| end date (GMT) | 2009-02-09 (40) |
| degree of supercooling | 1.60 |
| crystalization cell temperature [degC] | 2.22 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 00:03:05 |
| control time (nucleation start) | 01:11:35 |
| control time (laten heat release) | 01:12:40 |
| control time (crystalize start) | 01:20:30 |
| control time (melt start) | 01:20:30 |
| control time (melt end) | 01:24:00 |
| control duration (stabilization) | 01:08:30 |
| control duration (nucleation) | 00:01:05 |
| control duration (crystalization) | 00:08:55 |
| control duration (observation) | 00:00:00 |
| control duration (total) | 00:12:25 |
| note |