Parameter Detail: ICE-21(run 1)
| start date (GMT) | 2009-02-09 (40) |
|---|---|
| end date (GMT) | 2009-02-09 (40) |
| degree of supercooling | 2.00 |
| crystalization cell temperature [degC] | 1.82 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.2 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 02:54:07 |
| control time (nucleation start) | 04:10:10 |
| control time (laten heat release) | 04:11:33 |
| control time (crystalize start) | 04:19:00 |
| control time (melt start) | 04:20:00 |
| control time (melt end) | 04:22:00 |
| control duration (stabilization) | 01:16:03 |
| control duration (nucleation) | 00:01:23 |
| control duration (crystalization) | 00:08:50 |
| control duration (observation) | 00:01:00 |
| control duration (total) | 00:11:50 |
| note |