Parameter Detail: ICE-01(run 13)
| start date (GMT) | 2009-01-06 (6) |
|---|---|
| end date (GMT) | 2009-01-06 (6) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.9 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 -> 3.77 |
| control time (stabilization start) | 20:08:48 |
| control time (nucleation start) | 21:41:18 |
| control time (laten heat release) | 21:42:45 |
| control time (crystalize start) | 21:59:39 |
| control time (melt start) | 22:37:19 |
| control time (melt end) | 22:39:40 |
| control duration (stabilization) | 01:32:30 |
| control duration (nucleation) | 00:01:27 |
| control duration (crystalization) | 00:18:21 |
| control duration (observation) | 00:37:40 |
| control duration (total) | 00:58:22 |
| note |