Parameter Detail: ICE-22(run 1)
| start date (GMT) | 2008-12-15 (350) |
|---|---|
| end date (GMT) | 2008-12-15 (350) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -10 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 19:35:57 |
| control time (nucleation start) | 21:40:10 |
| control time (laten heat release) | 21:42:20 |
| control time (crystalize start) | 22:21:00 |
| control time (melt start) | 23:02:00 |
| control time (melt end) | 23:04:10 |
| control duration (stabilization) | 02:04:13 |
| control duration (nucleation) | 00:02:10 |
| control duration (crystalization) | 00:40:50 |
| control duration (observation) | 00:41:00 |
| control duration (total) | 01:24:00 |
| note |