Parameter Detail: ICE-22(run 3)
| start date (GMT) | 2008-12-16 (351) |
|---|---|
| end date (GMT) | 2008-12-16 (351) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8.7 |
| nucleation cell temperature (post nucleation) [degC] | 3.78 |
| control time (stabilization start) | 19:09:15 |
| control time (nucleation start) | 20:10:08 |
| control time (laten heat release) | 20:11:40 |
| control time (crystalize start) | 20:32:00 |
| control time (melt start) | 21:09:30 |
| control time (melt end) | 21:12:08 |
| control duration (stabilization) | 01:00:53 |
| control duration (nucleation) | 00:01:32 |
| control duration (crystalization) | 00:21:52 |
| control duration (observation) | 00:37:30 |
| control duration (total) | 01:02:00 |
| note |