Parameter Detail: ICE-22(run 4)
| start date (GMT) | 2008-12-17 (352) |
|---|---|
| end date (GMT) | 2008-12-17 (352) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.78 |
| control time (stabilization start) | 04:20:00 |
| control time (nucleation start) | 06:00:00 |
| control time (laten heat release) | 06:01:37 |
| control time (crystalize start) | 06:20:30 |
| control time (melt start) | 07:51:00 |
| control time (melt end) | 07:52:50 |
| control duration (stabilization) | 01:40:00 |
| control duration (nucleation) | 00:01:37 |
| control duration (crystalization) | 00:20:30 |
| control duration (observation) | 01:30:30 |
| control duration (total) | 01:52:50 |
| note |