Parameter Detail: ICE-22(run 5)
| start date (GMT) | 2009-01-14 (14) |
|---|---|
| end date (GMT) | 2009-01-14 (14) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -13 |
| nucleation cell temperature (post nucleation) [degC] | 3.78 |
| control time (stabilization start) | 19:48:43 |
| control time (nucleation start) | 21:15:44 |
| control time (laten heat release) | 21:22:45 |
| control time (crystalize start) | 21:40:08 |
| control time (melt start) | 22:47:20 |
| control time (melt end) | 22:49:45 |
| control duration (stabilization) | 01:27:01 |
| control duration (nucleation) | 00:07:01 |
| control duration (crystalization) | 00:24:24 |
| control duration (observation) | 01:07:12 |
| control duration (total) | 01:34:01 |
| note |