Parameter Detail: ICE-22(run 7)
| start date (GMT) | 2009-01-21 (21) |
|---|---|
| end date (GMT) | 2009-01-21 (21) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.78 |
| control time (stabilization start) | 02:03:46 |
| control time (nucleation start) | 02:55:23 |
| control time (laten heat release) | 02:56:52 |
| control time (crystalize start) | 03:34:11 |
| control time (melt start) | 04:41:00 |
| control time (melt end) | 04:43:19 |
| control duration (stabilization) | 00:51:37 |
| control duration (nucleation) | 00:01:29 |
| control duration (crystalization) | 00:38:48 |
| control duration (observation) | 01:06:49 |
| control duration (total) | 01:47:56 |
| note |