Parameter Detail: ICE-22(run 8)
| start date (GMT) | 2009-01-29 (29) |
|---|---|
| end date (GMT) | 2009-01-29 (29) |
| degree of supercooling | 0.04 |
| crystalization cell temperature [degC] | 3.78 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -4.2 |
| nucleation cell temperature (post nucleation) [degC] | 3.78 |
| control time (stabilization start) | 20:04:17 |
| control time (nucleation start) | 21:30:21 |
| control time (laten heat release) | 21:31:20 |
| control time (crystalize start) | 21:45:10 |
| control time (melt start) | 23:04:27 |
| control time (melt end) | 23:04:27 |
| control duration (stabilization) | 01:26:04 |
| control duration (nucleation) | 00:00:59 |
| control duration (crystalization) | 00:14:49 |
| control duration (observation) | 01:19:17 |
| control duration (total) | 01:34:06 |
| note |