Parameter Detail: ICE-01(run 16)
| start date (GMT) | 2009-01-19 (19) |
|---|---|
| end date (GMT) | 2009-01-20 (20) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.9 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 |
| control time (stabilization start) | 22:00:10 |
| control time (nucleation start) | 23:00:33 |
| control time (laten heat release) | 23:02:00 |
| control time (crystalize start) | 23:38:10 |
| control time (melt start) | 01:00:10 |
| control time (melt end) | 01:02:24 |
| control duration (stabilization) | 01:00:23 |
| control duration (nucleation) | 00:01:27 |
| control duration (crystalization) | 00:37:37 |
| control duration (observation) | 01:22:00 |
| control duration (total) | 02:01:51 |
| note |