Parameter Detail: ICE-01(run 2)
| start date (GMT) | 2008-12-17 (352) |
|---|---|
| end date (GMT) | 2008-12-17 (352) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.9 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 |
| control time (stabilization start) | 19:28:00 |
| control time (nucleation start) | 20:55:08 |
| control time (laten heat release) | 20:56:10 |
| control time (crystalize start) | 22:05:15 |
| control time (melt start) | 23:50:00 |
| control time (melt end) | 23:52:20 |
| control duration (stabilization) | 01:27:08 |
| control duration (nucleation) | 00:01:02 |
| control duration (crystalization) | 01:10:07 |
| control duration (observation) | 01:44:45 |
| control duration (total) | 02:57:12 |
| note |