Parameter Detail: ICE-01(run 23)
| start date (GMT) | 2009-02-11 (42) |
|---|---|
| end date (GMT) | 2009-02-11 (42) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -4 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 |
| control time (stabilization start) | 03:49:28 |
| control time (nucleation start) | 05:01:53 |
| control time (laten heat release) | 05:02:55 |
| control time (crystalize start) | 05:17:52 |
| control time (melt start) | 06:32:19 |
| control time (melt end) | 06:52:00 |
| control duration (stabilization) | 01:12:25 |
| control duration (nucleation) | 00:01:02 |
| control duration (crystalization) | 00:15:59 |
| control duration (observation) | 01:14:27 |
| control duration (total) | 01:50:07 |
| note |