Parameter Detail: ICE-02(run 1)
| start date (GMT) | 2008-12-11 (346) |
|---|---|
| end date (GMT) | 2008-12-11 (346) |
| degree of supercooling | 0.05 |
| crystalization cell temperature [degC] | 3.77 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -10 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 19:59:15 |
| control time (nucleation start) | 22:45:08 |
| control time (laten heat release) | |
| control time (crystalize start) | 23:07:00 |
| control time (melt start) | 23:37:04 |
| control time (melt end) | 23:39:48 |
| control duration (stabilization) | 02:45:53 |
| control duration (nucleation) | |
| control duration (crystalization) | 00:21:52 |
| control duration (observation) | 00:30:04 |
| control duration (total) | 00:54:40 |
| note |