Parameter Detail: ICE-02(run 2)
| start date (GMT) | 2009-01-07 (7) |
|---|---|
| end date (GMT) | 2009-01-07 (7) |
| degree of supercooling | 0.05 |
| crystalization cell temperature [degC] | 3.77 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.5 |
| nucleation cell temperature (post nucleation) [degC] | 3.77 |
| control time (stabilization start) | 19:53:00 |
| control time (nucleation start) | 20:50:08 |
| control time (laten heat release) | 20:51:30 |
| control time (crystalize start) | 21:06:25 |
| control time (melt start) | 21:46:45 |
| control time (melt end) | 21:49:18 |
| control duration (stabilization) | 00:57:08 |
| control duration (nucleation) | 00:01:22 |
| control duration (crystalization) | 00:16:17 |
| control duration (observation) | 00:40:20 |
| control duration (total) | 00:59:10 |
| note |