Parameter Detail: ICE-02(run 3)
| start date (GMT) | 2009-01-07 (7) |
|---|---|
| end date (GMT) | 2009-01-08 (8) |
| degree of supercooling | 0.05 |
| crystalization cell temperature [degC] | 3.77 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.2 |
| nucleation cell temperature (post nucleation) [degC] | 3.77 |
| control time (stabilization start) | 22:25:10 |
| control time (nucleation start) | 00:09:08 |
| control time (laten heat release) | 00:10:20 |
| control time (crystalize start) | 00:28:47 |
| control time (melt start) | 01:33:26 |
| control time (melt end) | 01:35:50 |
| control duration (stabilization) | 01:43:58 |
| control duration (nucleation) | 00:01:12 |
| control duration (crystalization) | 00:19:39 |
| control duration (observation) | 01:04:39 |
| control duration (total) | 01:26:42 |
| note |