Parameter Detail: ICE-02(run 4)
| start date (GMT) | 2009-01-12 (12) |
|---|---|
| end date (GMT) | 2009-01-12 (12) |
| degree of supercooling | 0.05 |
| crystalization cell temperature [degC] | 3.77 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -11.5 |
| nucleation cell temperature (post nucleation) [degC] | 3.77 |
| control time (stabilization start) | 19:53:00 |
| control time (nucleation start) | 21:09:33 |
| control time (laten heat release) | 21:14:26 |
| control time (crystalize start) | 21:23:40 |
| control time (melt start) | 22:06:35 |
| control time (melt end) | 22:08:00 |
| control duration (stabilization) | 01:16:33 |
| control duration (nucleation) | 00:04:53 |
| control duration (crystalization) | 00:14:07 |
| control duration (observation) | 00:42:55 |
| control duration (total) | 00:58:27 |
| note |