Parameter Detail: ICE-03(run 1)
| start date (GMT) | 2008-12-10 (345) |
|---|---|
| end date (GMT) | 2008-12-10 (345) |
| degree of supercooling | 0.06 |
| crystalization cell temperature [degC] | 3.76 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -9.1 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 20:41:13 |
| control time (nucleation start) | 22:18:10 |
| control time (laten heat release) | 22:19:50 |
| control time (crystalize start) | 22:49:15 |
| control time (melt start) | 23:07:00 |
| control time (melt end) | 23:09:30 |
| control duration (stabilization) | 01:36:57 |
| control duration (nucleation) | 00:01:40 |
| control duration (crystalization) | 00:31:05 |
| control duration (observation) | 00:17:45 |
| control duration (total) | 00:51:20 |
| note |