Parameter Detail: ICE-03(run 2)
| start date (GMT) | 2009-01-08 (8) |
|---|---|
| end date (GMT) | 2009-01-09 (9) |
| degree of supercooling | 0.06 |
| crystalization cell temperature [degC] | 3.76 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.6 |
| nucleation cell temperature (post nucleation) [degC] | 3.76 |
| control time (stabilization start) | 23:45:10 |
| control time (nucleation start) | 01:04:48 |
| control time (laten heat release) | 01:06:15 |
| control time (crystalize start) | 01:21:40 |
| control time (melt start) | 02:01:51 |
| control time (melt end) | 02:04:27 |
| control duration (stabilization) | 01:19:38 |
| control duration (nucleation) | 00:01:27 |
| control duration (crystalization) | 00:16:52 |
| control duration (observation) | 00:40:11 |
| control duration (total) | 00:59:39 |
| note |