Parameter Detail: ICE-03(run 5)
| start date (GMT) | 2009-01-20 (20) |
|---|---|
| end date (GMT) | 2009-01-20 (20) |
| degree of supercooling | 0.06 |
| crystalization cell temperature [degC] | 3.76 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.2 |
| nucleation cell temperature (post nucleation) [degC] | 3.76 |
| control time (stabilization start) | 01:20:10 |
| control time (nucleation start) | 02:19:13 |
| control time (laten heat release) | 02:20:45 |
| control time (crystalize start) | 02:34:45 |
| control time (melt start) | 03:12:00 |
| control time (melt end) | 03:14:40 |
| control duration (stabilization) | 00:59:03 |
| control duration (nucleation) | 00:01:32 |
| control duration (crystalization) | 00:15:32 |
| control duration (observation) | 00:37:15 |
| control duration (total) | 00:55:27 |
| note |