Parameter Detail: ICE-03(run 6)
| start date (GMT) | 2009-02-12 (43) |
|---|---|
| end date (GMT) | 2009-02-12 (43) |
| degree of supercooling | 0.06 |
| crystalization cell temperature [degC] | 3.76 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | 0 |
| nucleation cell temperature (post nucleation) [degC] | 3.76 |
| control time (stabilization start) | 04:15:57 |
| control time (nucleation start) | 05:26:18 |
| control time (laten heat release) | 05:27:00 |
| control time (crystalize start) | 05:41:30 |
| control time (melt start) | 06:16:00 |
| control time (melt end) | 06:17:00 |
| control duration (stabilization) | 01:10:21 |
| control duration (nucleation) | 00:00:42 |
| control duration (crystalization) | 00:15:12 |
| control duration (observation) | 00:34:30 |
| control duration (total) | 00:50:42 |
| note |