Parameter Detail: ICE-04(run 1)
| start date (GMT) | 2008-12-09 (344) |
|---|---|
| end date (GMT) | 2008-12-10 (345) |
| degree of supercooling | 0.07 |
| crystalization cell temperature [degC] | 3.75 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -4.6 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 22:13:08 |
| control time (nucleation start) | 23:27:09 |
| control time (laten heat release) | 23:28:00 |
| control time (crystalize start) | 23:59:10 |
| control time (melt start) | 00:25:18 |
| control time (melt end) | 00:28:04 |
| control duration (stabilization) | 01:14:01 |
| control duration (nucleation) | 00:00:51 |
| control duration (crystalization) | 00:32:01 |
| control duration (observation) | 00:26:08 |
| control duration (total) | 01:00:55 |
| note |