Parameter Detail: ICE-04(run 5)
| start date (GMT) | 2009-01-08 (8) |
|---|---|
| end date (GMT) | 2009-01-08 (8) |
| degree of supercooling | 0.07 |
| crystalization cell temperature [degC] | 3.75 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.75 |
| control time (stabilization start) | 21:40:10 |
| control time (nucleation start) | 22:38:38 |
| control time (laten heat release) | 22:39:50 |
| control time (crystalize start) | 22:54:10 |
| control time (melt start) | 23:34:00 |
| control time (melt end) | 23:37:00 |
| control duration (stabilization) | 00:58:28 |
| control duration (nucleation) | 00:01:12 |
| control duration (crystalization) | 00:15:32 |
| control duration (observation) | 00:39:50 |
| control duration (total) | 00:58:22 |
| note |