Parameter Detail: ICE-04(run 7)
| start date (GMT) | 2009-02-09 (40) |
|---|---|
| end date (GMT) | 2009-02-09 (40) |
| degree of supercooling | 0.07 |
| crystalization cell temperature [degC] | 3.75 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8.7 |
| nucleation cell temperature (post nucleation) [degC] | 3.75 |
| control time (stabilization start) | 04:26:45 |
| control time (nucleation start) | 05:35:58 |
| control time (laten heat release) | 05:37:49 |
| control time (crystalize start) | 05:46:14 |
| control time (melt start) | 06:11:57 |
| control time (melt end) | 06:15:00 |
| control duration (stabilization) | 01:09:13 |
| control duration (nucleation) | 00:01:51 |
| control duration (crystalization) | 00:10:16 |
| control duration (observation) | 00:25:43 |
| control duration (total) | 00:39:02 |
| note |