Parameter Detail: ICE-04(run 9)
| start date (GMT) | 2009-02-18 (49) |
|---|---|
| end date (GMT) | 2009-02-18 (49) |
| degree of supercooling | 0.07 |
| crystalization cell temperature [degC] | 3.75 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -1.3 |
| nucleation cell temperature (post nucleation) [degC] | 3.75 |
| control time (stabilization start) | 01:03:27 |
| control time (nucleation start) | 01:56:21 |
| control time (laten heat release) | 01:57:11 |
| control time (crystalize start) | 02:08:10 |
| control time (melt start) | |
| control time (melt end) | |
| control duration (stabilization) | 00:52:54 |
| control duration (nucleation) | 00:00:50 |
| control duration (crystalization) | 00:11:49 |
| control duration (observation) | |
| control duration (total) | |
| note |