Parameter Detail: ICE-05(run 2)
| start date (GMT) | 2009-01-08 (8) |
|---|---|
| end date (GMT) | 2009-01-08 (8) |
| degree of supercooling | 0.08 |
| crystalization cell temperature [degC] | 3.74 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | |
| nucleation cell temperature (post nucleation) [degC] | -6.8 |
| control time (stabilization start) | 01:57:25 |
| control time (nucleation start) | 03:20:14 |
| control time (laten heat release) | 03:21:40 |
| control time (crystalize start) | 03:30:45 |
| control time (melt start) | 03:55:46 |
| control time (melt end) | 03:58:22 |
| control duration (stabilization) | 01:22:49 |
| control duration (nucleation) | 00:01:26 |
| control duration (crystalization) | 00:10:31 |
| control duration (observation) | 00:25:01 |
| control duration (total) | 00:38:08 |
| note |