Parameter Detail: ICE-05(run 5)
| start date (GMT) | 2009-01-19 (19) |
|---|---|
| end date (GMT) | 2009-01-19 (19) |
| degree of supercooling | 0.08 |
| crystalization cell temperature [degC] | 3.74 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.1 |
| nucleation cell temperature (post nucleation) [degC] | 3.74 |
| control time (stabilization start) | 02:56:28 |
| control time (nucleation start) | 04:10:36 |
| control time (laten heat release) | 04:12:10 |
| control time (crystalize start) | 04:20:51 |
| control time (melt start) | 04:34:45 |
| control time (melt end) | 04:37:01 |
| control duration (stabilization) | 01:14:08 |
| control duration (nucleation) | 00:01:34 |
| control duration (crystalization) | 00:10:15 |
| control duration (observation) | 00:13:54 |
| control duration (total) | 00:26:25 |
| note |