Parameter Detail: ICE-06(run 2)
| start date (GMT) | 2009-01-12 (12) |
|---|---|
| end date (GMT) | 2009-01-13 (13) |
| degree of supercooling | 0.09 |
| crystalization cell temperature [degC] | 3.73 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.4 |
| nucleation cell temperature (post nucleation) [degC] | 3.73 |
| control time (stabilization start) | 22:21:01 |
| control time (nucleation start) | 00:36:15 |
| control time (laten heat release) | 00:37:36 |
| control time (crystalize start) | 00:48:20 |
| control time (melt start) | 01:06:10 |
| control time (melt end) | 01:09:00 |
| control duration (stabilization) | 02:15:14 |
| control duration (nucleation) | 00:01:21 |
| control duration (crystalization) | 00:12:05 |
| control duration (observation) | 00:17:50 |
| control duration (total) | 00:32:45 |
| note |