Parameter Detail: ICE-06(run 3)
| start date (GMT) | 2009-01-14 (14) |
|---|---|
| end date (GMT) | 2009-01-14 (14) |
| degree of supercooling | 0.09 |
| crystalization cell temperature [degC] | 3.73 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.73 |
| control time (stabilization start) | 03:08:08 |
| control time (nucleation start) | 04:19:28 |
| control time (laten heat release) | 04:21:05 |
| control time (crystalize start) | 04:31:10 |
| control time (melt start) | 04:51:46 |
| control time (melt end) | 04:55:00 |
| control duration (stabilization) | 01:11:20 |
| control duration (nucleation) | 00:01:37 |
| control duration (crystalization) | 00:11:42 |
| control duration (observation) | 00:20:36 |
| control duration (total) | 00:35:32 |
| note |