Parameter Detail: ICE-06(run 6)
| start date (GMT) | 2009-02-17 (48) |
|---|---|
| end date (GMT) | 2009-02-17 (48) |
| degree of supercooling | 0.09 |
| crystalization cell temperature [degC] | 3.73 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -1.5 |
| nucleation cell temperature (post nucleation) [degC] | 3.73 |
| control time (stabilization start) | 00:36:25 |
| control time (nucleation start) | 01:42:43 |
| control time (laten heat release) | 01:43:31 |
| control time (crystalize start) | 01:52:33 |
| control time (melt start) | 02:17:45 |
| control time (melt end) | 02:20:15 |
| control duration (stabilization) | 01:06:18 |
| control duration (nucleation) | 00:00:48 |
| control duration (crystalization) | 00:09:50 |
| control duration (observation) | 00:25:12 |
| control duration (total) | 00:37:32 |
| note |