Parameter Detail: ICE-07(run 2)
| start date (GMT) | 2009-01-13 (13) |
|---|---|
| end date (GMT) | 2009-01-13 (13) |
| degree of supercooling | 0.10 |
| crystalization cell temperature [degC] | 3.72 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8.8 |
| nucleation cell temperature (post nucleation) [degC] | 0 -> 3.72 |
| control time (stabilization start) | 01:22:40 |
| control time (nucleation start) | 02:08:33 |
| control time (laten heat release) | 02:10:20 |
| control time (crystalize start) | 02:39:00 |
| control time (melt start) | 03:03:00 |
| control time (melt end) | 03:05:00 |
| control duration (stabilization) | 00:45:53 |
| control duration (nucleation) | 00:01:47 |
| control duration (crystalization) | 00:30:27 |
| control duration (observation) | 00:24:00 |
| control duration (total) | 00:56:27 |
| note |