Parameter Detail: ICE-07(run 3)
| start date (GMT) | 2009-01-15 (15) |
|---|---|
| end date (GMT) | 2009-01-15 (15) |
| degree of supercooling | 0.10 |
| crystalization cell temperature [degC] | 3.72 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -9.5 |
| nucleation cell temperature (post nucleation) [degC] | 3.72 |
| control time (stabilization start) | 19:22:35 |
| control time (nucleation start) | 21:00:10 |
| control time (laten heat release) | 21:02:00 |
| control time (crystalize start) | |
| control time (melt start) | |
| control time (melt end) | 22:41:13 |
| control duration (stabilization) | 01:37:35 |
| control duration (nucleation) | 00:01:50 |
| control duration (crystalization) | |
| control duration (observation) | |
| control duration (total) | 01:41:03 |
| note |