Parameter Detail: ICE-01(run 6)
| start date (GMT) | 2008-12-24 (359) |
|---|---|
| end date (GMT) | 2008-12-25 (360) |
| degree of supercooling | 0.03 |
| crystalization cell temperature [degC] | 3.79 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -8.8 |
| nucleation cell temperature (post nucleation) [degC] | 3.79 |
| control time (stabilization start) | 21:16:33 |
| control time (nucleation start) | 23:50:15 |
| control time (laten heat release) | 23:51:55 |
| control time (crystalize start) | 00:07:30 |
| control time (melt start) | 00:36:18 |
| control time (melt end) | 00:39:00 |
| control duration (stabilization) | 02:33:42 |
| control duration (nucleation) | 00:01:40 |
| control duration (crystalization) | 00:17:15 |
| control duration (observation) | 00:28:48 |
| control duration (total) | 00:48:45 |
| note |