Parameter Detail: ICE-08(run 1)
| start date (GMT) | 2008-12-02 (337) |
|---|---|
| end date (GMT) | 2008-12-03 (338) |
| degree of supercooling | 0.20 |
| crystalization cell temperature [degC] | 3.62 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5.4 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 23:18:00 |
| control time (nucleation start) | 00:50:00 |
| control time (laten heat release) | 00:51:00 |
| control time (crystalize start) | 01:06:00 |
| control time (melt start) | 01:13:00 |
| control time (melt end) | 01:17:00 |
| control duration (stabilization) | 01:32:00 |
| control duration (nucleation) | 00:01:00 |
| control duration (crystalization) | 00:16:00 |
| control duration (observation) | 00:07:00 |
| control duration (total) | 00:27:00 |
| note |