Parameter Detail: ICE-08(run 3)
| start date (GMT) | 2009-01-19 (19) |
|---|---|
| end date (GMT) | 2009-01-19 (19) |
| degree of supercooling | 0.20 |
| crystalization cell temperature [degC] | 3.62 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7.6 |
| nucleation cell temperature (post nucleation) [degC] | 3.62 |
| control time (stabilization start) | 04:57:37 |
| control time (nucleation start) | 05:42:23 |
| control time (laten heat release) | 05:44:01 |
| control time (crystalize start) | 05:48:07 |
| control time (melt start) | 05:58:09 |
| control time (melt end) | 06:01:00 |
| control duration (stabilization) | 00:44:46 |
| control duration (nucleation) | 00:01:38 |
| control duration (crystalization) | 00:05:44 |
| control duration (observation) | 00:10:02 |
| control duration (total) | 00:18:37 |
| note |