Parameter Detail: ICE-09(run 1)
| start date (GMT) | 2008-12-02 (337) |
|---|---|
| end date (GMT) | 2008-12-02 (337) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.4 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 21:35:00 |
| control time (nucleation start) | 22:27:00 |
| control time (laten heat release) | 22:28:00 |
| control time (crystalize start) | 22:39:00 |
| control time (melt start) | 22:44:00 |
| control time (melt end) | 22:47:00 |
| control duration (stabilization) | 00:52:00 |
| control duration (nucleation) | 00:01:00 |
| control duration (crystalization) | 00:12:00 |
| control duration (observation) | 00:05:00 |
| control duration (total) | 00:20:00 |
| note |