Parameter Detail: ICE-09(run 2)
| start date (GMT) | 2008-12-08 (343) |
|---|---|
| end date (GMT) | 2008-12-09 (344) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -6.4 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 22:17:00 |
| control time (nucleation start) | 01:00:00 |
| control time (laten heat release) | 01:01:25 |
| control time (crystalize start) | 01:12:00 |
| control time (melt start) | 01:17:51 |
| control time (melt end) | 01:21:00 |
| control duration (stabilization) | 02:43:00 |
| control duration (nucleation) | 00:01:25 |
| control duration (crystalization) | 00:12:00 |
| control duration (observation) | 00:05:51 |
| control duration (total) | 00:21:00 |
| note |