Parameter Detail: ICE-09(run 3)
| start date (GMT) | 2009-01-15 (15) |
|---|---|
| end date (GMT) | 2009-01-16 (16) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -7 |
| nucleation cell temperature (post nucleation) [degC] | 3.52 |
| control time (stabilization start) | 23:15:10 |
| control time (nucleation start) | 00:20:10 |
| control time (laten heat release) | 00:21:40 |
| control time (crystalize start) | |
| control time (melt start) | |
| control time (melt end) | |
| control duration (stabilization) | 01:05:00 |
| control duration (nucleation) | 00:01:30 |
| control duration (crystalization) | |
| control duration (observation) | |
| control duration (total) | |
| note |