Parameter Detail: ICE-09(run 4)
| start date (GMT) | 2009-01-16 (16) |
|---|---|
| end date (GMT) | 2009-01-16 (16) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -9 |
| nucleation cell temperature (post nucleation) [degC] | 3.52 |
| control time (stabilization start) | 04:07:33 |
| control time (nucleation start) | 05:07:15 |
| control time (laten heat release) | 05:09:15 |
| control time (crystalize start) | 05:11:23 |
| control time (melt start) | 05:16:51 |
| control time (melt end) | 05:19:58 |
| control duration (stabilization) | 00:59:42 |
| control duration (nucleation) | 00:02:00 |
| control duration (crystalization) | 00:04:08 |
| control duration (observation) | 00:05:28 |
| control duration (total) | 00:12:43 |
| note |