Parameter Detail: ICE-09(run 5)
| start date (GMT) | 2009-01-20 (20) |
|---|---|
| end date (GMT) | 2009-01-20 (20) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | 0 |
| nucleation cell temperature (post nucleation) [degC] | 3.52 |
| control time (stabilization start) | 19:39:57 |
| control time (nucleation start) | 21:00:47 |
| control time (laten heat release) | 21:01:00 |
| control time (crystalize start) | 21:04:58 |
| control time (melt start) | 21:09:36 |
| control time (melt end) | 21:12:22 |
| control duration (stabilization) | 01:20:50 |
| control duration (nucleation) | 00:00:13 |
| control duration (crystalization) | 00:04:11 |
| control duration (observation) | 00:04:38 |
| control duration (total) | 00:11:35 |
| note |