Parameter Detail: ICE-09(run 7)
| start date (GMT) | 2009-02-08 (39) |
|---|---|
| end date (GMT) | 2009-02-08 (39) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -1 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 20:03:08 |
| control time (nucleation start) | 21:26:47 |
| control time (laten heat release) | 21:27:05 |
| control time (crystalize start) | 21:54:00 |
| control time (melt start) | 22:00:25 |
| control time (melt end) | 22:03:20 |
| control duration (stabilization) | 01:23:39 |
| control duration (nucleation) | 00:00:18 |
| control duration (crystalization) | 00:27:13 |
| control duration (observation) | 00:06:25 |
| control duration (total) | 00:36:33 |
| note |