Parameter Detail: ICE-09(run 8)
| start date (GMT) | 2009-02-11 (42) |
|---|---|
| end date (GMT) | 2009-02-11 (42) |
| degree of supercooling | 0.30 |
| crystalization cell temperature [degC] | 3.52 |
| nucleation cell temperature (pre nucleation) [degC] | 10 |
| nucleation cell temperature (nucleation start) [degC] | -10 |
| nucleation cell temperature (laten heat release) [degC] | -5 |
| nucleation cell temperature (post nucleation) [degC] | 0 |
| control time (stabilization start) | 02:21:35 |
| control time (nucleation start) | 03:23:34 |
| control time (laten heat release) | 03:24:42 |
| control time (crystalize start) | 03:36:00 |
| control time (melt start) | 03:41:20 |
| control time (melt end) | 03:45:00 |
| control duration (stabilization) | 01:01:59 |
| control duration (nucleation) | 00:01:08 |
| control duration (crystalization) | 00:12:26 |
| control duration (observation) | 00:05:20 |
| control duration (total) | 00:21:26 |
| note |